Discover arailway modellingjewel with ourkit models, which will allow you to enjoy pleasurable moments and relive the age in which the streets thronged withcarriagessuch as these.
Thislocomotive, which was manufactured by Robert Stephenson & Co. of Newcastle, was shipped in pieces from Newcastle to the Port of Rotterdam, from there it was transported up the Rhine to Cologne, and from Cologne, with a great deal of difficulty, it had then to be transported overland to Nuremberg.
When it finally reached its destination it was put back together at the workshops of Johann Wilhelm Spaeth. Thecoacheswere built in wood by local workshops.
On 7th December 1835 it completed its maiden journey from Furth to Nuremberg, along a line measuring 6.04 km in length.
You will find out, step by step, how to put together amodelfeaturing all the details of the originalcarriage. We invite you to let yourself get carried away and set up spaces for creative leisure in which you can enjoy this marvellousmodel train.
It is a good locomotive for introducing yourself to theRailway modelling.